Skip to product information
1 of 11

SANWA SUPPLY

Silent Wireless Mouse (with Side Wheel, 5 Buttons) MA-WBS524BK

Silent Wireless Mouse (with Side Wheel, 5 Buttons) MA-WBS524BK

GTIN(JAN):4969887702017

SKU:MA-WBS524BK

Regular price ¥3,340 JPY
Regular price Sale price ¥3,340 JPY
Sale Sold out
Quantity

Important: Return Policy

Please review your order carefully before completing the purchase. We do not accept returns or exchanges for customer errors (e.g., wrong size, color, or accidental purchase)

[A wireless mouse equipped with a side wheel that allows you to scroll left and right when working in Excel or browsing web pages.]

●A wireless mouse equipped with a side wheel that allows you to scroll left and right.
●You can easily scroll left and right when working in Excel or browsing web pages.
*Compatible with Office 2016 and later.
●Easy to hold and fits comfortably in your hand.
●Wireless type that can be used without worrying about cables.
●Small receiver that can be carried and stored while plugged into a laptop.
●The receiver can be easily stored by simply plugging it into the back of the mouse body.
●Stable data communication is possible over a wide range of up to a radius of 10m.
●Equipped with a power switch to reduce battery consumption when not in use.
●Equipped with two buttons on the side for quick "back" and "forward" operations in web browsers, etc.
*Cannot be used with Apple Mac series.
●The cursor speed can be switched between three levels: 1000, 1600, and 2400 counts.
●By downloading the button assignment software "SANWA SUPPLY Mouse Utility" from the website, you can assign functions to the scroll wheel button and side buttons.
*Only usable with Windows.

■Color: Black
■Connection method: 2.4GHz wireless
■Interface: USB1.1
*Can also be used with USB 10Gbps/5Gbps/2.0 interfaces.
■Connector shape: USB A connector
■Reading method: Optical sensor method (blue LED)
■Communication range: Wooden desk (non-magnetic material)/radius approx. 10m
Steel desk (magnetic material)/radius approx. 2m
*The radio wave communication range varies depending on the usage environment.
■Number of buttons: 5 buttons
■Buttons: Left button, right button, wheel (scroll) button, back button, forward button, count switching button
■Horizontal scrolling function: Yes
■Resolution: 1000, 1600, 2400 counts/inch
*Count switching button included
■Battery: 1 AA battery
*Compatible with alkaline batteries, manganese batteries, and nickel-metal hydride rechargeable batteries.
*Alkaline batteries are recommended.
■Receiver storage: Yes
■Size classification: Medium
■Size:
Mouse/W76.6xD109.6xH44.7mm
Receiver/W15xD18.6xH6.5mm
■Weight:
Mouse/Approx. 81g (excluding battery)
Receiver/Approx. 2g
■Set contents: Mouse, receiver, AA battery x1 (for testing), instruction manual and warranty
View full details