Skip to product information
1 of 11

SANWA SUPPLY

Silent Wireless Mouse MA-WBS327G

Silent Wireless Mouse MA-WBS327G

GTIN(JAN):4969887702161

SKU:MA-WBS327G

Regular price ¥2,033 JPY
Regular price Sale price ¥2,033 JPY
Sale Sold out
Quantity

Important: Return Policy

Please review your order carefully before completing the purchase. We do not accept returns or exchanges for customer errors (e.g., wrong size, color, or accidental purchase)

[A slim wireless mouse with a thickness of approximately 30mm, making it easy to carry. The receiver can be stored inside the top case.]

●A slim wireless mouse with a thickness of approximately 30mm, making it easy to carry.
●Its symmetrical shape allows for comfortable use by both right-handed and left-handed users.
●It is a wireless type that can be used without worrying about cables.
●It uses the 2.4GHz digital band, which is resistant to radio interference, and enables stable data communication over a wide range of up to a radius of 10m.
●The receiver is extremely small, so it does not protrude much when plugged into a port, and it does not get in the way when carrying or storing the laptop with the receiver plugged in.
●The receiver can be stored inside the top case.
●It has a power switch to reduce battery consumption when not in use.

■Color: Green
■Connection method: 2.4GHz wireless
※The ID between the mouse and receiver is fixed.
■Interface: USB 1.1
*Can also be used with USB 10Gbps/5Gbps/2.0 interfaces.
■Connector shape: USB A connector
■Reading method: Optical sensor method (blue LED)
■Communication range: Wooden desk (non-magnetic material)/approx. 10m radius
Steel desk (magnetic material)/approx. 2m radius
*The radio wave communication range varies depending on the usage environment.
■Number of buttons: 3 buttons
■Buttons: Left button, right button, wheel (scroll) button
■Silent: Left and right buttons, wheel button
■Resolution: 1000, 1600 counts/inch
*With count switching button
■Battery: 1 x AA battery
*Compatible with alkaline batteries, manganese batteries, and nickel-metal hydride rechargeable batteries.
*Alkaline batteries are recommended.
■Receiver storage: Yes
■Size classification: Medium
■Size:
Mouse/W58xD110xH29mm
Receiver/Approx. W14.3xD19.5xH6.5mm
■Weight:
Mouse/Approx. 55g (excluding batteries)
Receiver/Approx. 2g
■Set contents: Mouse, receiver, AA batteries (for testing), warranty card
View full details