1
/
of
11
SANWA SUPPLY
Silent Wireless Blue LED Mouse MA-WBS311R
Silent Wireless Blue LED Mouse MA-WBS311R
GTIN(JAN):4969887700488
SKU:MA-WBS311R
Regular price
¥1,888 JPY
Regular price
Sale price
¥1,888 JPY
Quantity
Couldn't load pickup availability
Important: Return Policy
Please review your order carefully before completing the purchase. We do not accept returns or exchanges for customer errors (e.g., wrong size, color, or accidental purchase)
[An ultra-compact, ultra-lightweight wireless mouse that fits comfortably in your fingertips.]
●An ultra-compact wireless mouse that fits comfortably in your fingertips.
●Its symmetrical shape makes it comfortable to use for both right-handed and left-handed users.
●It's a wireless type that can be used without worrying about cables.
●It uses the 2.4GHz digital band, which is resistant to radio interference, and enables stable data communication over a wide range of up to a radius of 10m.
●The receiver is small at 15x18.6mm, so it doesn't protrude much when plugged into a port, and it doesn't get in the way when carrying or storing it with the receiver plugged into a laptop.
●The receiver can be stored in the mouse body, so there is no need to worry about losing it.
●It has an ON/OFF switch to reduce battery consumption when not in use.
■Color: Red
■Wireless method: 2.4GHz wireless
※The ID between the mouse and receiver is fixed.
■Interface: USB1.1
※Can also be used with USB 10Gbps/5Gbps/2.0 interfaces.
■Connector shape: USB A connector
■Reading method: Optical sensor method (blue LED)
■Communication range: Wooden desk (non-magnetic material)/approx. 10m radius, Steel desk (magnetic material)/approx. 2m radius
*The radio wave communication range varies depending on the usage environment.
■Number of buttons: 3 buttons
■Buttons: Left button, right button, wheel (scroll) button
■Resolution: 1200 counts/inch
■Battery: 1 AAA battery
*Compatible with alkaline batteries, manganese batteries, and nickel-metal hydride rechargeable batteries.
*Alkaline batteries are recommended.
■Receiver storage: Yes
■Size classification: Ultra-compact
■Size: Mouse/W47xD79xH33mm
Receiver/W15xD18.6xH6.5mm
■Weight: Mouse/Approx. 36g (excluding batteries)
Receiver/Approx. 2g
■Set contents: Mouse, receiver, AAA batteries (for testing), instruction manual and warranty
●An ultra-compact wireless mouse that fits comfortably in your fingertips.
●Its symmetrical shape makes it comfortable to use for both right-handed and left-handed users.
●It's a wireless type that can be used without worrying about cables.
●It uses the 2.4GHz digital band, which is resistant to radio interference, and enables stable data communication over a wide range of up to a radius of 10m.
●The receiver is small at 15x18.6mm, so it doesn't protrude much when plugged into a port, and it doesn't get in the way when carrying or storing it with the receiver plugged into a laptop.
●The receiver can be stored in the mouse body, so there is no need to worry about losing it.
●It has an ON/OFF switch to reduce battery consumption when not in use.
■Color: Red
■Wireless method: 2.4GHz wireless
※The ID between the mouse and receiver is fixed.
■Interface: USB1.1
※Can also be used with USB 10Gbps/5Gbps/2.0 interfaces.
■Connector shape: USB A connector
■Reading method: Optical sensor method (blue LED)
■Communication range: Wooden desk (non-magnetic material)/approx. 10m radius, Steel desk (magnetic material)/approx. 2m radius
*The radio wave communication range varies depending on the usage environment.
■Number of buttons: 3 buttons
■Buttons: Left button, right button, wheel (scroll) button
■Resolution: 1200 counts/inch
■Battery: 1 AAA battery
*Compatible with alkaline batteries, manganese batteries, and nickel-metal hydride rechargeable batteries.
*Alkaline batteries are recommended.
■Receiver storage: Yes
■Size classification: Ultra-compact
■Size: Mouse/W47xD79xH33mm
Receiver/W15xD18.6xH6.5mm
■Weight: Mouse/Approx. 36g (excluding batteries)
Receiver/Approx. 2g
■Set contents: Mouse, receiver, AAA batteries (for testing), instruction manual and warranty
Share
